What's New
Changes in version 3.0 What's new
- Redesigned interface - now ‘native’ interface for both platforms –Windows and Macintosh;
- Network diagram generating;
- Calculation and displaying dates of Earliest start and Latest finish;
- Calculation and displaying time reserves;
- Filtering tasks by different parameters;
- Sorting tasks by different parameters;
- Inserting lists of tasks, divided with the line feed;
- Automatic terms shifting at change of the starting project date;
- Changing color of a task;
- Changing font color;
- Changing properties for marked out tasks simultaneously;
- Simultaneous dragging of marked out tasks on Gantt diagram either vertically or horizontally;
- Simultaneous assigning resources to all subtasks of the marked out phase;
- Inserting data into marked out line of the resource view, without activation of edit mode;
- Inputing data into cell: the first mouse click marks out a cell, the second activates the editing mode and highlights the whole text ( this operation can also be performed by double clicking at the selected cell), and the third click locates the text cursor at the position under the mouse cursor.
- Adding the new task after the highlighted one by using ‘Insert’ key;
- Linking two tasks by dragging one of them onto another. This way the ‘finish to start’ link between two tasks will be created, begining from the task where dragging started to the task where mouse was released.
- Moving the hightlighted cell with Tab, Enter and with arrow keys.
- Floating dialogs General, Resource, Notes, Project, Format, Assign Resourсes;
- Renewed set of templates and examples;
Changes in version 2.1 What's new
- Import from MindManager added
- Some bugs fixed
Changes in version 2.0 What's new
- Individual work schedule for each resource
- Man-hour definition for each resource
- Notes about tasks as floating tips on mouse over task
- Reports can be saved in MS Excel format (XLS) and Rich Text Format (RTF)
Changes in version 1.3.5 What's new
- Improved visualization in Gantt chart view (WYSIWYG)
- Some bugs fixed
Changes in version 1.3. What's new
- New reports connected with resources: Overallocated resources, Cash flow on resources, Who Does What When (resource report).
- Some bugs fixed.
Changes in version 1.2. What's new
- The possibility of creation of 2 more report types has appeared: Overview (Project overview) and Costs (Cash flow). The first type allows to create a general description of the project, the second one provides information on the task cost for a ceratin time period.
- To the task context menu the item Send E-Mail To Assignment Resources has been added. This allows to send an e-mail to any of the resources that have their e-mail addresses specified.
- The function of personalization of columns has appeared. You can now customize columns at your discretion in the dialog Column Customize, which can be started from the menu View / Column Customization.
- On assigning links the lag between the dependent and independent tasks can be specified in various time measurements: minutes, hours, days and weeks. Let's remind you that this lag is specified in the dialog Task Information on the tab Predecessors in the cell Lag. This data is considered by the program in calculations.
- On the platform Macintosh in the menu Window new items for showing/ hiding of the window have been added as well as the items for horizontal/vertical alignment.
- Now in all project windows (Gantt chart, resource list and workspace) buttons for inserting and deleting are active Insert / Cmd+K / Cmd+Back and Delete.
- Some minor debugging has been done.
Changes in version 1.1. What's new
The program features extended possibilities for the final presentation of the document:
- The system of report creation has changed. Many types of customized reports on the project status appeared: all the tasks, started, finished in a certain time interval etc. You can also choose columns to be displayed in the report.
Now you can export your document to ConceptDraw XML format as well.
For more convenience the following changes have been made:
- On starting the program a start dialog appears, which provides options of choice for your work start : create a new document, choose the already existing one or open the most recent document.
Functions of copying, cutting and pasting. You can copy/ cut / paste both the selected text and the whole task, resource or a project, including all their parameters. For quick selection of all the elements the function Select All has been added.
|