Scheduling Project Downloads
Downloads may easily be scheduled. Every Project can be started automatically at specified time intervals. To set scheduling, select the desired Project and select Advanced | Scheduling from the Properties dialog.
| Manual: |
No schedule. |
| Daily: |
Start the download every day at the specified time. |
| Weekly: |
Start the download once a week on the selected Weekday at the specified time. |
| Monthly and Yearly: |
Start the download at the specified time every month or year. |
| Every: |
Start the download at a specific time (every Hour : Minute). |
| Only once: |
Download only once at the specified time and then reset the Schedule to the Manual state. |
|